9 Reviews (43) New Blog
WhatsApp
Dex zoekt...
ELVE bill of exchange order book, blue, 102×270 mm, 50 sheets, with carbon copy
🔍 Click to enlarge
Image of the brand owner
By the manufacturer
ELVE bill of exchange order book, blue, 102×270 mm, 50 sheets, with carbon copyELVE bill of exchange order book, blue, 102×270 mm, 50 sheets, with carbon copy
ℹ The image may differ from the exact product. Always check the specifications for exact size, colour and features.
ELVE

ELVE bill of exchange order book, blue, 102×270 mm, 50 sheets, with carbon copy

€5,17
incl. VAT
€4,27 excl. VAT (21%)
You are ordering: Size: 102 x 270 mm · Colour: blue
Price excluding shipping costs: €4,95 incl. VAT for orders under €49,95. From €49,95 we ship for free.
✓ In stock (11 pieces)
Ordered now, delivered Wednesday
📦
Need more? New stock expected in week 47 (16 November - 22 November 2026).
Place your order and we'll make sure it's delivered on time.
Brand: ELVE
Article number83501472
EAN3416790002396
OEM number239
Weight0,150 kg
DimensionsB: 110 mm × H: 70 mm × D: 270 mm
Country of originFrankrijk
Customs tariff (HS code)48209000
VAT rate21%
Dex

This is why Dex likes this article

Practical order book with 50 forms and a handy check strip.⁠‌‌‌‍‌‍‌‌‍‍‍‍‍‌‍‌‌‌‍‌‌‌‌‍‍‌‍‌‌‌‌‌‌‌‌‌‌‍‍‌⁠ The sturdy cover protects against wear, and the size fits perfectly in your desk drawer.⁠‌‌‌‍‌‍‌‌‍‍‍‍‍‌‍‌‌‌‍‌‌‌‌‍‍‌‍‌‌‌‌‌‌‌‌‌‌‍‍‌⁠

When do you choose this product?

What does this order book do?
The ELVE Wisselorders order book is designed for manually recording orders and bookings. With the carbon copy function, you automatically make a copy of each order, so you can give one copy to the customer and keep one for your own records. This is essential for restaurants, cafés, catering companies and other hospitality venues where quick order recording is crucial.

Why choose this format?
The compact size of 102×270 mm fits perfectly in your trouser pocket or apron, so you always have it to hand while serving. With 50 sheets you have enough orders for a busy shift, without the book becoming too thick to carry comfortably. The size is ideal for noting down several dishes per order without running out of space.

Practical carbon copy function
The carbon copy system ensures that every order you write is automatically copied. The 90 g/m² paper is sturdy enough for good writing, yet thin enough for a clear carbon impression. The blue print on the front gives structure to your orders and creates a professional appearance.

Durable construction for daily use
The glossy 350 g/m² cover with a cardboard base offers sturdiness during intensive use in hospitality. The book keeps its shape, even when you often take it out of your pocket and write in it while standing or walking. The tear-off strips ensure that torn-off orders stay neat and don't fray.

Specifications according to the manufacturer

Arial;

dKop
• Tekst

Specifications

Model
Order slips
Size
Number of pages
50 sheets
Colour
Packed
10

Manufacturer

Lebon & Vernay SAS

BP 237

38506 Voiron Cedex

F

wwww.elve.com

Hazard information

✓ No hazard classification applies according to the available manufacturer and supplier information.
This product contains no substances classified as hazardous under the CLP Regulation.
Product information checked by XtremeOffice
This page has been compiled based on information from the manufacturer and our supplier. Last checked on 30-10-2026.